Reconstruction ASKRS of  Rovno NPP.

"Positron" have taken part in ASKRS system modernization of Rovno NPP's (Ukraine) and a delivery of equipment.
3-rd Power Unit
 
Two analyzers AMP-12 "Puls-1А" integrated with a top-level system a program-engineering complex "Volcano-RK" (made in "Westron", Kharkov, Ukraine) was deliver during the first stage of the project in 2003.
The five analyzers AMP-12 "Puls-1
А" was deliver during the second stage of the project in 2004.
4-th Power Unit
The seven analyzers AMP-12 "Puls-1
А" was deliver in March 2004.
In 2005 we will plane delivering
АMP-12 "Puls-1А" for one and two Power Units of Rovno NPP.

Main

News

About us

Production

Services

Projects

 

 
Reconstruction ASKRS of Ignalina NPP.

"Positron" had took part in a building modern system ASKRS of Ignalina NPP (Lithuania) on a basis of analyzer AMP-12 "Puls 1A".

The first analyzer AMP-12 "Puls 1A" was deliver to Ignalina NPP for tests in December, 2003

The eighteen analyzers AMP-12 "Puls 1A" was deliver to Ignalina NPP for exploitation in 2005 year.


 

To top

Reconstruction ASKRS of Zaporozhye NPP.

 

"Positron" had took part in a building modern system ASKRS of Ignalina NPP (Lithuania) on a basis of analyzer AMP-12 "Puls 1A".
The first analyzer AMP-12 "Puls 1A" was deliver to Ignalina NPP
for tests in December, 2003
The eighteen analyzers AMP-12 "Puls 1A" was delivery to Ignalina NPP for exploitation in 2005 year.
The five analyzers AMP-12 "Puls 1
А" was deliver to Zaporozhye NPP in September 2004, for use them in the composition of program-engineering complex of Power Unit №1 ASKRS.
"Positron" will deliver the seventeen analyzers for Power Unit
№1 and five analyzers for Power Unit 2.
In total "Positron" will have been deliver sixty-eight units of analyzer for modernization of 1 and 2 Power Units of Zaporozhye NPP.


 

Reconstruction CRS of the Novovoronezh APP.
In September 2004 it was deliver the first AMP-12 "Puls 1А" to Novo-Voronezh NPP for a test.
In October 2004, it was deliver three more analyzer for test at NPP.